Blue ArcRequest a Consultation
Completed dock and boat lift on the waters of Gasparilla Sound, Boca Grande, FL.

Coastal · Benthic Survey

Opening-day benthic survey, no seagrass in the footprint

A Boca Grande dock needed an FDEP benthic survey before its modification permit could move. The survey window opens one day a year. We were in the water on day one, and the footprint came back clear.

Location
Gasparilla Island (Boca Grande), Charlotte County, FL
Project
Dock modification permit, waterfront residence
Scope
FDEP-compliant benthic survey and assessment report
Blue Arc role
Field benthic survey, bathymetry, protected-species habitat characterization

Field to report

2 days

Survey window met

Opening Day (June 1)

Seagrass present

None Identified

The challenge


The dock modification permit needed an FDEP-compliant benthic survey. State rules only allow that survey during the seagrass growing season, June 1 through September 30. There is no flexibility on the window. Miss the opening and the permit waits.

What Blue Arc did


We ran the field survey on June 1, opening day. We swam GPS-referenced transects along the dock footprint, out to the waterward limit of the dock or the -4' MLW contour, whichever was further. We logged bathymetry. We characterized the bottom and the protected-species habitat. Then we wrote the FDEP-compliant Benthic Survey Assessment Report.

Benthic Survey Assessment drawing. Survey limits over the Gasparilla Sound dock footprint. No seagrass observed, silty sandy bottom. Client detail removed.
Benthic Survey Assessment: survey limits over the dock footprint on Gasparilla Sound. No seagrass observed. Client detail removed.

The result


No seagrass in the survey limits. That removed one of the main regulatory constraints on the dock modification. We delivered the report within a week of being hired, and the permit moved forward without delay.

Why it mattered


On a barrier island, the survey window is a door that opens once a year. Miss it and the permit sits until next season. We were in the water on day one and had the report out in a week. That keeps a project on this year's calendar, not next year's.

Want this on your project?

Got a dock, a shoreline, or a coastal build waiting on a survey window? Let's look before it closes.

Request a Project Consultation