The 10.6-acre DeSoto County parcel during the site assessment, with existing disturbances in the foreground.

Environmental · Site Assessment

A signed environmental baseline in three days

A 10.6-acre parcel in DeSoto County had unknown wetlands, possible protected-species habitat, and old disturbances on the ground. The owner needed to know what it could support before planning a build. We ran a full field ESA and signed the report in three days.

Location
Rural DeSoto County, FL
Project
Environmental Site Assessment, site development feasibility
Scope
Field ESA, wetland delineation, soil borings, FLUCCS mapping, listed-species and cultural-resource review
Blue Arc role
Full field assessment and signed ESA report

Site assessed

10.6 ac

Field to signed report

3 days

Wetland communities mapped

2

The challenge


The owner wanted to know if a 10.6-acre parcel in rural DeSoto County could support a build. The wetland extent was unknown. There was possible listed-species habitat. And the ground already carried disturbances: fill, a debris pile, and a pond. Each one could change what gets built and where.

What Blue Arc did


We ran a full field ESA. We used a Trimble R780 GPS to fix property corners, wetland lines, and soil sample points. We advanced five soil borings to read the hydric conditions. We mapped FLUCCS across four land cover types. We checked NWI data against what we saw in the field, assessed listed-species potential under FWC guidance, and searched the Florida Master Site File for cultural resources.

Soil boring with a Munsell color chart, used to read hydric conditions during the field assessment.
A soil boring with a Munsell color chart, used to read hydric conditions in the field.

The result


We signed the ESA report three days after field work. We delineated 7.15 acres of jurisdictional wetlands, forested and herbaceous. No listed species. No cultural resources. Every disturbance mapped. The owner got a clean environmental baseline to plan around.

Why it mattered


You can't plan a build on a parcel you don't understand. An unknown wetland, a listed-species surprise, an unrecorded disturbance: any one can redraw what's buildable after the money's committed. A signed baseline in three days means the owner planned on facts, not guesses, and kept moving.